Post Offer Free
Ningbo Nide Mechanical Equipment Co., Ltd.
Ningbo Nide Mechanical Equipment Co., Ltd.  

Gold Index: 56391

You are here: home  > stator winding line  > Stator varnishing machine  > Automatic stator coil varnish dipping machine

Automatic stator coil varnish dipping machine 

Price: 20000.0 USD 
Payment Terms: T/T,L/C 
Place of Origin: Zhejiang, China (Mainland) 
inquire skype
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: ND-ZCJR
Production Capacity: 40 sets
Delivery Date: 30 days
Varnish depth: 160mm
Working temperature: less than 145 C, adjustable
Power: 75KW (electricity supply);1...
Machine color: Customized
Condition: New
Means of Transport: Ocean,Land
Packing: Wooden case which is suitab...
Working position: 32
Bracket dimension: 900mm*300mm
Productivity: 4000-5000pcs/20 hours
Machine name: varnishing machine
package: suitable for sea transporti...

This varnishing machine is suitable for stators do do coil varnish dipping process.

The stator varnishing machine is used for insulation treatment for various motor stator winding, transformer coil etc. The whole process, except for loading and unloading workpiece , is completely automatically. The machine automatically finishes the full procedure of pre-heating, dipping, dropping, colloidization and post curing, etc.

The automatic production guarantees the good and stable quality standard of the workpiece. A. comparing with the traditional varnish way, the production efficiency is much higher. B. the coating is even, there is no unnecessary coating on the workpiece, so it's helpful for saving cost of varnish, work time, labor.

 

Technical parameter and specification

Quantity   of work positions

32

varnish   depth(mm)

320

Basket   dimension(mm)

890*350

Pitch   time(min)

1-30adjustable

Heating   preparation time(min)

≤45

Working   temperature of the dryer(℃)

≤150℃

Power(KW)

120

Dimension(M)

11.08*2.37*2.82

Weight(T)

4.5


Operation

 1. At first, the pitch time, dipping time must be set in screen.

2.Turn on the power, check the three-phase indicator, which should shows 380V.

3. Press START button to start the fan motor of heating air cycling, indicator should be on.

4.Switch on all heating switch for each heating zone, indicator should be on. The heater begins to work.  And regulate the temperatures for each zone.

5. Switch on the exhaust motor, indicator should be on.

6. Switch on the varnish pump, indicator should be on. The varnish is pumped from the varnish container to the varnish tank in cycling condition.

7. Before stopping the machine, switch off the power of the heater firstly. 10 minutes later, then stop the heating air cycling fan motor. Finally press STOP button after all waste gas is exhausted.


Stators suitable for this machine


Machine diagram

Ms. Annie
skype Ms. Annie
Sales Manager
Tel: 86-574-87295639
Fax: 86-574-87295637
Mobile: 86- 137 3886 9026
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

Ningbo Nide Mechanical Equipment Co., Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Ningbo
Province/State: Zhejiang
Country/Region: China (Mainland)

Follow Us: Follow us on facebook Follow us on linkedin

Annie:   skype
Annie:   qq

You May Like: